This blog is about instrumentation and control engineering with all information related to plant process,Equipments,field and control instrumentsprojects, seminars, job vacancies and subject theories
FIELD INSTRUMENTS
Friday, November 20, 2015
Thursday, November 19, 2015
Ignition Triangle
Ignition Triangle:
In chemical point of view, oxidation, combustion and explosion are all exothermic
reactions with different reaction speeds. For such reactions to take place, it is essential that the
following three components be present simultaneously in due proportions.
• Oxidizer: generally, air or oxygen.
•Heat( Ignition Energy): electrical or thermal heat energy.
Saturday, November 14, 2015
Boiler Steam Drum Level Control
- Drum Level Control Systems are used extensively throughout the process industries and the Utilities to control the level of boiling water contained in boiler drums on process plant and help provide a constant supply of steam.
- If the level is too high, flooding of steam purification equipment can occur. If the level is too low, reduction in efficiency of the treatment and re circulation function. Pressure can also build to dangerous levels.
- A drum level control system tightly controls the level whatever the disturbances, level change, increase/ decrease of steam demand, feed water flow variations.
Wednesday, December 24, 2014
Wednesday, July 9, 2014
Types of logic block algorithms ( gates)
- Null (NULL)
- AND Gate (AND)
- OR Gate (OR)
- NOT Gate (NOT)
- NAND Gate (NAND)
- NOR Gate (NOR)
- XOR Gate (XOR)
- Qualified OR Gate with 2 inputs On (QOR2)
- Qualified OR Gate with 3 inputs On (QOR3)
- Compare Equal with Deadband (EQ)
- Compare Not Equal with Deadband (NE)
- Compare Greater then with Deadband(GT)
- Compare Greater then or Equal with Deadband(GE)
- Compare Less then with Deadband(LT)
- Compare less then or Equal with Deadband(LE)
- Check for Bad(CHECKBAD)
- Fixed size bulse(PULSE)
- Pulse with maximum Time Limit(MAXPULSE)
- Pulse with Minimum Time Limit(MINPULSE)
- Delay(DELAY)
- On Delay(ONDLY)
- Off Delay(OFFDLY)
- Watchdog Timer(WATCHDOG)
- Flipflop(FLIPFLOP)
- Change Detect(CHDETECT)
How to restart the GUS station ?
- start
- log in- administrator
- LCN P windows status under status column power-ON wait for 2 min
- open native windows
- select Load button on right corner screen
- screen will show WN 1,2,3........ then type N then press enter
- wait 1 min
- system status will be on screen
other option
- start - enter
- select program
- select Honeywell TPS
- select native window
- select control
- then load
Subscribe to:
Posts (Atom)
